Consulting
Loss of the Day 01, When a R$450 Round Pool Turned Into 10 Hours of Work
I charged my usual flat R$450 for a non-standard round pool. I got scope and layout wrong, and 3 hours of work became 10. Episode 01 of Loss of the Day.
DESIGN PROCESS
The act of designing, from brief to delivery: requirements, approval cycles, scope, information standards, and value delivered.
I charged my usual flat R$450 for a non-standard round pool. I got scope and layout wrong, and 3 hours of work became 10. Episode 01 of Loss of the Day.
Why most engineers working on design today have turned into virtual bricklayers, and how to get out of this Matrix before it's too late.
The most important things I learned in 5 years as a building services engineer: scope, BIM, value delivered, and what I changed to stop drowning.